Water park design steps

Water park design steps

From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related Water Slide News
Related Products
Latest Haisan & Water Park News
12 2024-10
How to Create a Unique Children's Water Park?
The development of children's water park projects has experienced rapid growth in recent years and has now become increasingly mature. The distinctive operation of children's water parks, espe...
05 2024-09
Things to Consider Before Purchasing Water Amusement Park Equipment
Understand what the mainstream water amusement park equipment is in the current parkAlmost all parks will purchase family skin rafting slides, family parent-child slides, interactive water fortresses,...
10 2024-08
Development Trends and Opportunities in the Aqua Park Market as it Approaches Saturation
In recent years, the development of aqua park projects has been booming. According to incomplete statistics, the number of water amusement parks currently built and under construction in China far sur...
25 2024-07
What are the After-sales Services for Small Aqua Park Equipment?
Nowadays, there are many aqua park equipment that are popular, especially small amusement equipment. So, what should be noticed when purchasing small aqua park equipment?The quality of aqua park equip...