Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Ⅰ. The design of the pool of the water park project should meet the following requirements


1. The water park project pool should be designed for waterproofing, and technical measures should be taken to avoid sinking, water leakage, cracking and other problems in the pool;


2. The pool body should be equipped with climbing ladders, and the climbing interval should not be greater than 15.0m;


3. Clear and visible water depth signs should be set on the pool wall of the water park project;


4. Anti-collision measures should be taken on the wall of the tsunami pools;


5. A full-length footrest should be set at 1.20m below the water surface of the pool wall, and the width should not be less than 0.15m;


6. An overflow trough should be set on the pool wall, and an overflow grate should be set on the trough; when the overflow trough is used as overflow backwater, it should not be discharged into the dirty water of the pool bank.


7. A lifeguard safety observatory should be set up for every 100 square meters of water surface area, and the height of the safety observatory from the pool bank floor should not be less than 1.20m. The safety observatory should be able to observe the entire recreational water area;


8. The water park project pool should be equipped with emergency drainage facilities. And the drain should take measures to prevent children from inhaling;


9. The edge of the pool should be set to prevent the surrounding rainwater, sewage, etc. from flowing into the pool;


10. The width of the pool bank should not be less than 7.0m, and the angle between the pool bank and the pool body should be rounded;


11. The ground surface material of the pool bank should be non-slip and easy to clean, and a drainage slope should be set.


Ⅱ. Calculation of the number of people in the water park project


1. The maximum number of people in the pool area of the water park project at the same time is calculated as 0.5 people/m.


2. The number of people in the vehicle area should be calculated based on the passenger capacity of the water park equipment.


Ⅲ. Housing and facilities of the water park project


The auxiliary rooms and facilities of the water park project shall comply with the relevant provisions of the current national standards and shall meet the following requirements:


1. The number of changing clothes, showers, toilets and sanitary wares should be determined according to the number of people who should be in accordance with the rated passenger capacity of the amusement pool of the water park project;


2. Before entering the recreational water area, it is mandatory to pass through sanitary facilities such as showers and disinfecting foot baths. The width of the disinfection foot bath should be the same width as the passage leading to the pool, the length of the disinfection foot bath should not be less than 2.0m, and the depth should not be less than 0.20m;


3. Anti-slip measures should be taken on the ground in wet spaces such as walkways, changing rooms, bathrooms and toilets;


4. The technical equipment room of the water park project should include water treatment room, water quality inspection room, water pump room, power distribution room, etc., as well as related computer rooms and warehouses;


5. When using liquid chlorine and other chemicals for water treatment, there should be an independent chlorination room and chemical storage room;


6. Technical measures such as fire prevention, explosion prevention and ventilation shall be adopted in the chlorination room and chemical storage room.


Related Water Slide News
Related Products
Latest Haisan & Water Park News
12 2024-10
How to Create a Unique Children's Water Park?
The development of children's water park projects has experienced rapid growth in recent years and has now become increasingly mature. The distinctive operation of children's water parks, espe...
05 2024-09
Things to Consider Before Purchasing Water Amusement Park Equipment
Understand what the mainstream water amusement park equipment is in the current parkAlmost all parks will purchase family skin rafting slides, family parent-child slides, interactive water fortresses,...
10 2024-08
Development Trends and Opportunities in the Aqua Park Market as it Approaches Saturation
In recent years, the development of aqua park projects has been booming. According to incomplete statistics, the number of water amusement parks currently built and under construction in China far sur...
25 2024-07
What are the After-sales Services for Small Aqua Park Equipment?
Nowadays, there are many aqua park equipment that are popular, especially small amusement equipment. So, what should be noticed when purchasing small aqua park equipment?The quality of aqua park equip...