Basic process of water park construction

After obtaining the land use right and project approval, carry out:           

(1) Conceptual design planning stage           

1. Select the concept design unit to carry out the docking of the concept design work;            2. Creative theme, story line theme image equipment list floor layout, overall aerial view, equipment outsourcing style, etc.           

(2) Selection stage of water amusement facilities           

1. Select and purchase equipment according to the equipment list provided by conceptual design, and determine the equipment production cycle;           

2. Determine equipment location, floor area and foundation drawings.           

(3) Planning and design stage of water park            

Scheme design:           

1. Interior packaging design of each partition plan, general plan, visitor moving line, traffic route and evacuation route;           

2. Interior landscape design, interior landscape props style design, assist tool props design;          

3. Lighting system design.           

Expansion design indoor packaging design:           

1. Interior landscape design;           

2. Environment art and scene props;           

3. Equipment packaging design;            

4. Lighting system design.           

Construction design:           

Including interior packaging design, landscape design, environmental art and scene props, equipment supporting packaging design, lighting system design, logo system design theme, logo design function logo, etc.

Civil construction stage

According to the planning drawings of the water park, pay special attention to the location of embedded parts, water inlet and outlet, load-bearing structure, etc.

Equipment installation and commissioning           

1. Registration and filing of quality supervision department;           

2. Equipment installation, equipment installation and commissioning;           

3. Amusement equipment acceptance certificate;           

4. Equipment maintenance and operation training.

Recruitment, establishment and training of operation team

1. Establishment of operation management system;           

2. Recruit core management and equipment maintenance personnel before equipment installation and commissioning;           

3. At the later stage of water park equipment installation and commissioning, the amusement equipment operators are in place;           

4. Service etiquette, process training and safety management training;           

5. Operation, maintenance and management personnel obtain corresponding certificates;           

6. Basic knowledge training of amusement equipment, operation emergency drill training, simulation and practical operation training of each post.

Trial operations

1. Employees are familiar with their own work process and service process;           

2. Collect feedback from tourists and upgrade;           

3. In the operation, we found the deficiencies and optimized the process;           

4. Troubleshooting and rectification of potential safety hazards.

Grand Opening

1. Prophase publicity;           

2. Activity arrangement;           

3. Passenger flow safety control;           

4. Crisis public relations drill;           

5. Safety emergency plan;           

6. Preferential policies for opening;           

7. Equipment maintenance and update.           

The preparation and construction of water park is not a simple project preparation and construction, but a process of overall planning, operation and management of the project as a whole.



Related Water Slide News
  • What do you value most when purchasing water park equipment?

    What do you value most when purchasing water park equipment?

    October 16, 2020Through the contact with a large number ofdifferent customers, we found that different investors pay more attention tothe purchase of water park equipment. Some investors value prices, someinvestors v...view
  • How can the water park equipment win at the starting line?

    How can the water park equipment win at the starting line?

    February 21, 2019To plan and design a water park, you must first understand the water park equipment. Water parks have properties such as large location and seasonal impact, low investment threshold and fast cost recovery. But even so, we must pay attention to the planninview
  • How to add theme elements to the water park?

    How to add theme elements to the water park?

    August 14, 2020From the moment the concept of the water park was born, it has been labeled as"This is a leisure place for tourists to relax and escape the heat insummer". With the development of the times and people...view
  • Water park construction period

    Water park construction period

    July 17, 2020If we do not consider the time for investor’s approvalprocedures and if civil engineering and water slide equipment production start at the sametime, the construction period of the water park project...view
  • How to do the marketing of Water Park from HAISAN water slide company Part 2

    How to do the marketing of Water Park from HAISAN water slide company Part 2

    March 5, 2019In the current marketing, activity planning is regarded as a powerful tool in the implementation of marketing. Because of its short business cycle, rigid consumption, short-term consumption, instant consumption, individual play and other characteristics,view
  • Who is traveling at night, big data tells you!-1

    Who is traveling at night, big data tells you!-1

    January 8, 2020Who is traveling at night, big data tells you!-1 Night tourism, as an important way to meet people's longing for a better life, boost tourism consumption, promote supply-side reforms and enrich deep cultural experiences, will provide new momentum for tview
Related Products
Latest Haisan & Water Park News
12 2024-10
How to Create a Unique Children's Water Park?
The development of children's water park projects has experienced rapid growth in recent years and has now become increasingly mature. The distinctive operation of children's water parks, espe...
05 2024-09
Things to Consider Before Purchasing Water Amusement Park Equipment
Understand what the mainstream water amusement park equipment is in the current parkAlmost all parks will purchase family skin rafting slides, family parent-child slides, interactive water fortresses,...
10 2024-08
Development Trends and Opportunities in the Aqua Park Market as it Approaches Saturation
In recent years, the development of aqua park projects has been booming. According to incomplete statistics, the number of water amusement parks currently built and under construction in China far sur...
25 2024-07
What are the After-sales Services for Small Aqua Park Equipment?
Nowadays, there are many aqua park equipment that are popular, especially small amusement equipment. So, what should be noticed when purchasing small aqua park equipment?The quality of aqua park equip...